The Kitchen

The kitchen was a mess.The work in the kitchen began with removing everything, including the crumbling plaster walls.
The walls, the wiring and the plumbing were redone. The new floor is Mexican tiles.A pass through to the hall was built and wainscotting laid to provide continuity with the hall and protect the walls.The wall behind the stove was left brick, but the bricks were too full of cement and plaster to remove. The bricks were cleaned as best could be done and then painted red. The counter is granite, with colors similar to the Mexican tiles.The cabinets are "Birch Shaker" from Dave's cabinets.A plate rack was installed over the sink.